Mitigation Number

Search This Blog

Saturday, 28 March 2020

Bath Road, Hounslow CLEARED AT 2213HRS

2143hrs,
Traffic signals at Harlington Corner have failed in all directions.

Buses diverted for safety reasons.
 


Routes Affected: 90,278,285,423,H98,X140

90 S/B From High Street, L Bath Road, L Nobel Drive circum navigate roundabout to Nobel Drive, R Bath Road, L North Hatton Road. Line of route.
 

90 N/B From Northern Perimeter Road, Ah Northern Perimerter Road, R Nene Road, R Bath Road, L High Street. Line of route.
 

H98 From Bath Road, Ah Bath Road, L Nene Road circum navigate roundabout to Nene Road, R Bath Road, L High Street. Line of route.
 

278 X140 From High Street, L Bath Road, L Nobel Drive circum navigate roundabout to Nobel Drive, R Bath Road to line of route.
 

285,423 From Bath Road, Ah Bath Road, Nobel Drive circum navigate roundabout to Nobel Drive, R Bath Road, L North Hatton Road. Line of route.

Diversion Reference D25526