Mitigation Number

Search This Blog

Thursday, 4 August 2022

Bethnal Green Road, E2/ CLEARED AT 0240Hrs

4th August at 1806hrs

Road blocked in both directions at St Matthew's Row due to a building fire.

Routes Affected: 8,388,N8

8,N8 From Shoreditch High Street at the junction with Bethnal Green Road Ahead Shoreditch High Street Right Hackney Road Right Cambridge Heath Road Left Roman Road, LOR. Same in reverse. 

388 From Shoreditch High Street at the junction with Bethnal Green Road Ahead Shoreditch High Street, Right Hackney Road Left Cambridge Heath, LOR. Same in reverse

Diversion Reference D47765