Mitigation Number

Mitigation Number

Search This Blog

Saturday, 22 October 2022

Bayswater Road,W2. CLEARED AT 1013hrs

22nd of October at 0927hrs

Road closed E/B at Queensway due to a planned crane operation and the temporary traffic signals are out.
Linked NOE CE22/32550A shows no diversion with 3 way temporary traffic signals

Routes Affected: 94,148

From Bayswater Road at Queensway Left Queensway Right Bishops Bridge Road Right Gloucester Terrace Left Lancaster Terrace Right Westbourne Street Left Bayswater Road LOR 

Diversion Reference D50044