Mitigation Number

Mitigation Number

Search This Blog

Thursday, 12 March 2020

Fieldway, New Addington - CLEARED AT 0500HRS

2300hrs

Road blocked in both directions at the junction with The Coppins due to a RTC.

Routes Affected: 64,130

Route 64 at Fieldway, A Lodge Lane, L Headley Drive to line of route in both directions.

Route 130 at Fieldway, A Lodge Lane to line of route in both directions.

Diversion Reference D25146