Mitigation Number

Mitigation Number

Search This Blog

Friday, 6 March 2020

Rotherhithe Tunnel SE16.CLEARED AT 1827hrs

1725hrs

The tunnel has been closed in both directions due to a collision in the tunnel.

Delays are to be expected in the Rotherhithe and Limehouse / Wapping areas as a result.

Log ref:539